Automotive Lamps Rubber Damping Pad
Automotive rubber damping pad-Automotive rubber damping pads leverage rubber's viscoelastic property for vibration reduction. Vibration energy gets dissipated via internal friction among rubber molecular chains, effectively mitigating vibration transmitted to vehicle sheet metal.
Engine noise dominates interior automotive noise. For superior noise suppression, sound insulation and absorption design of the front bulkhead are critical. A hollow structure is reserved between inner and outer bulkhead panels.

Expansion damping materials are embedded inside the cavities. After coating and high-temperature curing, the materials combine with surrounding sheet metal to form a constrained damping structure, blocking low and medium frequency engine noise from entering the cabin. Extra sound insulation and absorption materials are also fitted at the front section to further isolate engine noise.
Experience: More than 20 years experience in rubber OEM production
Shape: According to customer's drawing
Package: PE bags, Cartons,Pallet
Payment Terms: T/T,L/C and so on.
Sample time: 25-30 days
Shipment Way: Vessel,Air,Express etc.
Below is our cooperated car brands for your reference.







Q1.Which kind of product do you produce?
Kingtom:Rubber injection parts,rubber compression parts and rubber extrusion parts,rubber-metal parts,plastic parts.
Q2.What information do you need for making price?
Kingtom:1.2D/3D drawing,or samples photo with detail size.
2.Material And Material hardness
3.Detail quantity
4.Your other requirements like tolerence,surface treatment.
5.Product usage environment
Q3.I don't have 3D drawing,how should i do ?
Kingtom:You can send one sample to us,then we can produce as your sample.
Q4:How to make sure the quality?
Kingtom:Check the samples before mass production.
There is the detail inspection report and goods photos before shipping.
Q5.Do you provide samples?
Kingtom:Yes,samples is free and you just pay the express cost.
Q6.How is the delivery time?
Kingtom:It usually takes 10-30days.It depends on the orders.









